Action 6

6

Answer

Extend the planned reduction in statutory timescales from 18 months to 12 months for offshore wind projects to all clean energy projects including solar, nuclear next to existing nuclear sites, and transmission lines. Additionally, there should be a presumption in statutory guidance that the pre-examination process should be limited to a maximum of 4 months.